Well done! Electric not…

The well is fully installed including the water softener/treatment. This is all ‘well’ and good, if we only had electric. AEP called yesterday to tell us that they screwed up and have pushed back our service install to Monday or Tuesday. Crap!

Deck

Got a deck started by the rear door. It’s gonna to be so very cool!

Update

Got Confirmation of electric by end of month…Well head installed, but not connected to the house…Septic system installed and inspected…Piles of Crushed concrete, delivered and ready for drive. We are getting so freakin’ close! Pictures coming soon to a book near you!

Meter Movement

Look very closely at the pictures below, you may just see the meter socket move from one side of the house to the other. Btw, I called the electrical inspector, yesterday, and he told me that he would look at the new installation some time that evening.

Here’s hoping that it passed!

Tower

Gettin’ a tower to hold an antenna & some wireless

Pipes

Why such large duct work for the heat? Anyone out there know?

It’s getting closer to finished

It keeps getting more done.

Sunset

The house looks good in the evening

House Setting

September 16, 2011: House moves on to foundation.

Electric

My neighbor is getting his trees removed, and the firewood and mulch from that, and we are getting our electric service. Another step closer

Btw, the house will be set this Friday and/or Saturday. Yeehaw!!